Wall Centre Central Park, Phase 2

Multi-Family Residential Wall Centre, Phase 2 LEED® Gold Certified Central Park Vancouver, CA Wall Centre Central Park is a two-phase real estate development that showcases both SHARC and PIRANHA technology. Phase 1 uses SHARC 660 system. Phase 2 contains 332 residential units and two PIRANHA T10 units. Phase 2 reduces CO2 emissions by 116 t CO2e/year. Product PIRANHA […]

EPRI Incubatenergy Clean Energy Challenge

Case Study EPRI & Incubatenergy® Labs PIRANHA™ System demonstrates CO2 & Cost reduction in Incubatenergy Labs Challenge SHARC Energy Systems was selected by Electric Power Research Institute (EPRI) and a collaborative of utilities as one of the top 10 companies in the Incubatenergy Labs Challenge to participate in a significant clean energy pilot demonstration for several […]

Boulder Commons Phase II

Multi-Family Residential Boulder Commons Phase II Boulder, CO 3200 Bluff Street is the second phase of a larger mixed-use development in Boulder, Colorado. This two-building, 98,000 square foot development will be directly adjacent to the first Boulder Commons project for which Integral Group also provided engineering and design services.  One building will consist primarily of […]

Sail Project

Multi-Family Residential The Sail Project University of British Columbia This SHARC installation is the highlight of a sustainable community plan at the University of British Columbia. The SHARC filters wastewater and provides source energy availability to the paired Colmac heat pumps that produce domestic hot water. The system generates 220,000 BTU’s per hour, reducing emissions […]