This project was implemented to supply space heating and cooling at a state-of-the-art wastewater treatment plant using their untreated influent. The SHARC system was commissioned in Spring 2015, contributing to LEED® Gold certification for the facility, eliminating the need for an air conditioning cooling tower. It provided typical heat transfer of 630,000 BTU/hr for heating and 500,000 BTU/hr for cooling, with a measured peak heat transfer of 1,500,000 BTU/hr and CO2 emission reduction of 96 tonnes per year.