SHARC Energy Welcomes Washington State’s Building Electrification Mandate

washington building electrification mandate

Starting 2023 Electric Heating and Cooling Required in New Commercial & Residential Buildings Vancouver, B.C, Canada (June 09, 2022) – SHARC International Systems Inc. (CSE: SHRC) (FSE: IWIA) (OTCQB: INTWF) (“SHARC Energy” or the “Company”), a world leader in energy transfer from wastewater, commends Washington for being the first US state to incorporate building electrification […]

leləm̓ living

residential complex leləm̓ life

District Energy / Mixed-Use Residential leləm̓ living A masterplanned community using SHARC District Energy WET system Vancouver, BC Leləm̓ Village is leading the way in sustainability by utilizing wastewater energy for their Passive Energy Loop (PEL).  The development’s heating and cooling needs are met by utilizing a SHARC WET (wastewater energy transfer) system as part […]

National Western Center

district energy national western center

District Energy National Western Center Denver, CA The National Western Center is a year-round urban hub for food and ag discovery — in the heart of the American West. Officially launched on April 2020. When complete in 2024, people from all walks of life will convene on the campus and online to lead, inspire, create, […]

3200 Bluff Boulder Commons

boulder commons wastewater

Multi-Family Residential 3200 Bluff Boulder Commons Phase II Boulder, CO 3200 Bluff Street is the second phase of a larger mixed-use development in Boulder, Colorado.  This two-building, 98,000 square foot development will be directly adjacent to the first Boulder Commons project for which Integral Group also provided engineering and design services. One building will consist primarily of offices […]

303 Battery

Seattle's greenest apartment tower

Multi-Family Residential 303 Battery Street Seattle’s greenest apartment tower Seattle, WA 303 Battery Street is a 15-story, 112-unit complex in Seattle’s Belltown neighbourhood, and is one of the first residential towers to be certified as Zero Net Energy by the International Living Future Institute (ILFI). The entire building, from slab to roof was built in just 12 […]

False Creek

False Creek Neighborhood energy utility

District Energy False Creek Neighbourhood Energy Utility (NEU) District level wastewater filtering Vancouver, BC The NEU, with the assistance of a SHARC Energy waste water filtration system, provides low-carbon heat and hot water to buildings in the False Creek area through the recycling of waste water heat and the use of renewable natural gas for […]

Wall Centre Central Park, Phase 2

wall center central park

Multi-Family Residential Wall Centre, Phase 2 LEED® Gold Certified Central Park Vancouver, CA Wall Centre Central Park is a two-phase real estate development that showcases both SHARC and PIRANHA technology. Phase 1 uses SHARC 660 system. Phase 2 contains 332 residential units and two PIRANHA T10 units. Phase 2 reduces CO2 emissions by 116 t CO2e/year. Product PIRANHA […]

EPRI Incubatenergy Clean Energy Challenge

EPRI incubatenergy clean energy challenge

PIRANHA Multi-Family Use Case Study EPRI & Incubatenergy® Labs Energy Utility validates PIRANHA CO2 & cost reduction SHARC Energy Systems was selected by Electric Power Research Institute (EPRI) and a collaborative of utilities as one of the top 10 companies in the Incubatenergy Labs Challenge to participate in a significant clean energy pilot demonstration for several […]

Empire MFR

empire wastewater heat recovery system installation

Multi-Family Residential Empire Vancouver, BC Coming soon Previous Next Customers Seven35 Building PIRANHA T10 HC Lake Louise Inn PIRANHA T10 Wall Centre Central Park, Phase 1 SHARC 660 False Creek Neighborhood Energy Utility SHARC 880 DC Water HQ SHARC 660 Sail Project SHARC 660 See more

Sechelt Water Resource Centre

sechelt water resourca centre

Industrial Sechelt Water Resource Centre Vancouver, BC This project was implemented to supply space heating and cooling at a state-of-the-art wastewater treatment plant using their untreated influent. The SHARC system was commissioned in Spring 2015, contributing to LEED® Gold certification for the facility, eliminating the need for an air conditioning cooling tower. It provided typical […]