Multi-Family Residential

Wall Centre, Phase 1

LEED® Gold Certified

Central Park Vancouver, CA

Wall Centre Central Park is a two-phase real estate development showcasing both PIRANHA & SHARC technology.

Each phase incorporates a wastewater heat recovery system, sized to provide approximately 30% of the water heating load at high efficiencies.

Phase 1 uses a a SHARC 660 system to recover heat for over 728 residential units.

Phase 2 uses PIRANHA technology.

The systems reduce emissions by 260 t CO2e/year.

Customer Highlights

Site Info
Product Installed Project Type Project Size Commissioned Developer Engineer Architect
SHARC 660 System Multi-Family Residential 728 Units August 2018 Wall Financial Corporation Sterling Cooper Consultants GBL Architects
SPECS & PERFORMANCE
Application Filtered Wastewater Flowrate (GPM) Heating/Cooling Ratio Design Energy Transfer (MBH) Design Energy Transferred (MMBTU/year) Heating Cooling
Baseline Alternate Baseline Alternate Efficiency Baseline Alternate Baseline Alternate Efficiency
DHW 100 100% / 0% 300* HX 4,073 Natural Gas - - -
IMPACT
Heating (DHW) Cooling
Natural gas avoided (therm/year) GHG equivalent (metric t CO2e/year) Approximate Impact Estimated water use reduction (gal/year) Evaporation reduction from cooling tower (gal/year) Blowdown reduction from cooling tower (gal/year)
Cars off Road Tree Offsetting CO2e
47,920 259 56.3 11,773 - - -

Quick Facts

  • Filters the wastewater before it passes through a heat exchanger that feeds a process loop
  • Acts as a source for a Colmac HPW24M heat pump. 
  • The heat pump is designed to provide continuous hot water at a setpoint of 120°F.

Want to know more?

Close

Contact Form

fullscreen pop up form that captures name, email, question type (sales, support, billing), subscribe (to zoho marketing hub list). Will need code from Zoho